Updated on: 05/08/223 — Great House Vietnam records directly at the construction site.
For apartments formed in the future, construction progress is the most reliable indicator of the investor's execution capability — more reliable than any commitment on paper. This article is updated periodically every month, with photos recorded on site at the two towers TT-01 and TT-03 of Yen Binh Complex, Van Xuan Ward, Thai Nguyen Province (the former Pho Yen City area).


1. Overview of the two apartment towers
| Item | TT-01 — The Rise | TT-03 — The Flow |
| Construction land area | 6,730 m² | 6,776 m² |
| Scale | 20 above-ground floors + 2 basements | 20 above-ground floors + 2 basements |
| Number of apartments | 700 units | 700 units |
| Type of apartment | Commercial apartments | 1BR+, 2BR, 2BR+, 3BR+ (52.7 – 135.7 m²) |
| General contractor | Xuan Mai Corp | Xuan Mai Corp |
| Status | Handed over (from 10/6) | Expected handover Q1/2027 |
| Bank guarantee | VietinBank – Ba Dinh Branch | VietinBank – Ba Dinh Branch |
Total supplied to the market by the two towers 1.400 apartments.

2. Why The Rise's progress is the most important fact for buyers of The Flow
This is a point many buyers overlook.
When buying an apartment that has not been completed, the biggest risk is not the price, but the risk that the investor fails to deliver the home as committed. For most projects, buyers have no way to verify other than trusting the capability profile.
Yen Binh Complex is an exception: the The Rise tower (TT-01) has actually been handed over to residents. This provides three verifiable facts:
- The investor has completed a full cycle from foundation to handover on the same land, with the same general contractor and the same legal file set.
- The handover quality can be seen with your own eyes. Buyers of The Flow can go to The Rise and directly view the finishing quality, materials, corridors, elevators and basement parking — instead of looking at 3D perspectives.
- Post-handover operating quality shows immediately. How the management board works, how much the service fee is, whether incidents are handled quickly or slowly — residents can already answer for real.
- Rental prices already have real figures. Many owners at The Rise have finished their interiors and leased out: a 2-bedroom 61 m² unit is leased at VND 8,000,000/month, and 67 – 73 m² units from VND 8,500,000 to 9,500,000/month. Buyers of The Flow therefore don't have to guess, but have a reference point right on site.
Great House's advice: Before signing the contract to buy The Flow, spend one visit going to The Rise, go up to a high floor, view a handed-over unit and ask the residents living there directly. One such visit is worth more than any sales document — including ours. If any advisory unit hesitates to take you to The Rise, that is a signal worth noting.

3. Construction progress log of The Flow (TT-03)
How to read this section: Each entry is recorded monthly with real photos. Great House only posts photos recorded directly by its team or from official sources of the investor, and does not use perspective renderings in place of construction photos.
June 10 — Handover of The Rise tower (TT-01)
Tower TT-01 was officially handed over to residents. This is the most important milestone in the history of implementing the apartment sub-zone at the Yen Binh Urban Area, establishing the actual handover capability of the investor and the general contractor Xuan Mai Corp.
Yen Binh Complex apartment handover – The Rise tower on June 10
August 2026 — The Flow tower has completed the rough construction and is preparing for the topping-out ceremony


- Completed items: Rough construction completed, the roof has been poured, preparing to hold the project's topping-out ceremony on 8/8/2026
- In progress: Completing the interior room partitions
- Assessment against the plan: On schedule
4. The role of the general contractor Xuan Mai Corp
- Xuan Mai Investment and Construction Joint Stock Company was selected as the general contractor for both towers. This is a unit with experience implementing many large-scale housing projects in Vietnam, especially strong in precast prestressed concrete technology — a technology that shortens the construction time of the structure compared with the traditional cast-in-place method.
- For buyers, the practical meaning of this is: the progress of the structure is usually more stable and predictable, and less dependent on the weather.

Note: a good general contractor reduces construction risk, but does not eliminate handover risk. The handover time also depends on the investor's cash flow, fire prevention and fighting acceptance procedures, and acceptance for putting the building into use. These stages lie outside the scope of the general contractor
5. Buyer protection mechanisms if handover is delayed
This is the part you should read carefully before signing the contract, instead of reading it after a problem arises.
Bank guarantee. The project has been granted a guarantee of the investor's financial obligations to buyers of future-formed housing by the Vietnam Joint Stock Commercial Bank for Industry and Trade (VietinBank) – Ba Dinh Branch, for both TT-01 and TT-03, under Article 26 of the 2023 Law on Real Estate Business, with a total of up to 1,400 units guaranteed.
Practical meaning: if the investor does not hand over as committed in the contract, buyers have the right to ask the bank to refund the amounts paid along with other amounts as agreed in the contract and the guarantee commitment.
Three things you need to do:
1. Request a separate guarantee letter for your own apartment. Project guarantee is a necessary condition; the guarantee letter for each unit is what directly protects you.
2. Read the late-handover penalty clause carefully in the sales and purchase contract, especially the permitted extension period and the penalty rate.
3. Cross-check the document certifying eligibility to sell future-formed housing issued by the Department of Construction — this is the mandatory legal basis for the investor to raise capital.
6. Frequently asked questions about progress
- When will Yen Binh Complex be handed over? The Rise tower (TT-01) has been handed over to residents since 10/6 and many units have now finished their interiors and are being leased. The Flow tower (TT-03) is expected to be handed over in Q1/2027 according to the investor's plan.
- How can the progress of Yen Binh Complex be verified independently? The most reliable way is to go directly to the construction site at Yen Binh Urban Area, Van Xuan Ward, Thai Nguyen Province. In addition, you can visit the handed-over The Rise tower to assess the actual finishing quality of the same investor and the same general contractor.
- If the investor delays handover, how are buyers protected? The project has a guarantee from VietinBank – Ba Dinh Branch under Article 26 of the 2023 Law on Real Estate Business. Buyers should request a separate guarantee letter for their own apartment and read the late-handover penalty clause in the contract carefully.
- Who is the general contractor of Yen Binh Complex? Xuan Mai Investment and Construction Joint Stock Company (Xuan Mai Corp) is the general contractor for both towers TT-01 and TT-03.
Great House Vietnam updates the progress of Yen Binh Complex at the start of every month. You can save this page to follow it, or leave your information to receive the update with site photos via Zalo. Hotline: 0936.233.666.